Pipeline
HDPE & DI Pipeline Works, Maval
Water pipeline works in HDPE and ductile iron (DI) at several sites in and around Vadgaon and Talegaon Dabhade, Maval — Darumbre, Malinagar and Shinde Tekdi, Yashwant Nagar, Anand Park, Katvi, Sanskriti Colony and Paravadi near the Indrayani river.
At each site an excavator cut the trench along the route — beside village roads, compound walls, open fields and the river bank. HDPE lengths were laid out along the trench and lowered in, and DI pipes were placed and jointed in the trench.
Before backfilling, the team checked trench depth and pipe alignment with a measuring tape against a straight edge laid across the trench, as seen in the Paravadi photos.
Dates below come from the GPS-stamped site photos taken between 3 November 2025 and 9 May 2026.
Work stages
How the work progressed.
- 013 – 4 Nov 2025
Darumbre & Vadgaon
Trenches cut with an excavator along the village road in Darumbre and near Vardayini Mata Mandir, Vadgaon.
- 025 Nov 2025
Malinagar roadside
Roadside trench excavation near Mahadaji Shinde Udyan, Malinagar.
- 035 – 6 Nov 2025
Yashwant Nagar, Talegaon
HDPE pipe laid out along the trench and lowered in with excavator support.
- 0416 Nov 2025
Anand Park & Katvi
HDPE line in the trench at Anand Park, Vadgaon; trench beside a compound wall at Katvi, Talegaon.
- 0520 Dec 2025
Shinde Tekdi jointing
Pipe jointing in the trench at Shinde Tekdi, Malinagar.
- 0614 Feb 2026
Sanskriti Colony
HDPE pipe laid along the trench in Sanskriti Colony, Vadgaon.
- 0710 – 11 Mar 2026
Paravadi & Malinagar
Pipeline laid beside the Indrayani river at Paravadi with depth and alignment checks; large-diameter pipes joined with excavator support at Malinagar.
- 089 May 2026
Sanskriti Colony trench
Excavator digging a further pipeline trench in Sanskriti Colony.
Gallery