A circular RCC water tank built from excavation to finished, painted structure with inlet and outlet pipework — photographed on site from October 2025 to August 2026.

A circular RCC water storage tank built for a housing society in Deccan Hills, Vadgaon — from an excavated pit to a finished, painted tank with inlet and outlet pipework and valve chambers.

After excavation and PCC, the raft reinforcement was tied (including night shifts) and the raft was cast with starter bars for the wall. The circular wall then rose in lifts inside steel shuttering, with an excavator supporting the site work and each lift cured with water.

Once the wall reached full height, the top slab was reinforced, shuttered at the edge and concreted, with props supporting it from inside the tank. The walls were then finished and painted, and the inlet and outlet pipes were connected through valve chambers.

Dates below come from the GPS-stamped site photos taken between 20 October 2025 and 13 August 2026.

Work stages

How the work progressed.

  1. 0120 Oct 2025

    Excavation & PCC

    The tank pit was excavated and a PCC bed laid as the base.

  2. 0223 – 30 Nov 2025

    Raft reinforcement

    Raft steel was tied with the circular edge shuttering; work continued at night to keep pace.

  3. 031 – 7 Dec 2025

    Raft cast

    The raft was concreted with the wall starter bars standing ready.

  4. 0431 Dec 2025 – 5 Jan 2026

    Wall steel & shuttering

    Circular wall reinforcement went up inside steel shuttering and supports, with an excavator working alongside.

  5. 0513 Jan – 16 Feb 2026

    Wall lifts

    The circular wall was shuttered, concreted and cured lift by lift up to full height.

  6. 0628 Mar 2026

    Top slab reinforcement

    Slab steel and edge shuttering were placed over the tank.

  7. 077 – 15 Apr 2026

    Top slab concreting

    The top slab was concreted and cured; the walls were kept wet for curing.

  8. 0826 Apr – 18 May 2026

    Inside props & wall openings

    Props below the slab inside the tank; the wall was prepared with openings for the inlet and outlet pipes.

  9. 0920 – 21 Jul 2026

    Painting & pipework

    The tank was painted and the inlet / outlet pipes connected through the valve chambers.

  10. 1013 Aug 2026

    Completed

    Finished, painted tank with its pipework and chambers in place.

Before & after

From site work to finished structure.

Drag the handle to compare the same spot during work and after completion.
RCC Water Tank (Taki), Deccan Hills: Finished, painted tank with inlet and outlet pipes and chambers
RCC Water Tank (Taki), Deccan Hills: Tank wall before finishing, with openings for the inlet and outlet pipes
Before· 18 May 2026After· 13 Aug 2026
Tank wall & pipework
RCC Water Tank (Taki), Deccan Hills: Top slab after concreting
RCC Water Tank (Taki), Deccan Hills: Top slab reinforcement and edge shuttering
Before· 28 Mar 2026After· 15 Apr 2026
Top slab
RCC Water Tank (Taki), Deccan Hills: Completed water tank on the same site
RCC Water Tank (Taki), Deccan Hills: Excavated pit with PCC at the start of work
Before· 20 Oct 2025After· 21 Jul 2026
The site — excavation to finished tank

Gallery

On site.

Start a conversation

Have a construction or infrastructure requirement?

Share your requirement — we’ll get back to you with the next steps.

Prefer to talk? Call +91 83790 62127

Chat with Swarajya Enterprises on WhatsApp