WTP Sanskruti, Vadgaon
The water treatment plant at Sanskriti Colony sits on a hillside in Vadgaon — a blue-tiled cascade aerator, filter channels with valves and walkways, a two-storey operator building and an elevated tank with a spiral stair.
Concrete for the plant yard was brought in by transit mixer and laid in panels around the buildings, the aerator and between the elevated tank's columns. Several pours were done at night under site lights, and each section was kept wet with hoses to cure.
The operator building was then finished outside, and in June a security fence with concertina wire was welded and fixed along the plant boundary.
The GPS-stamped photos below date from 28 February to 25 June 2026; the photos of the completed plant are undated.
Work stages
How the work progressed.
- 0128 Feb 2026
Yard concreting begins
A transit mixer delivered concrete for the first yard sections, placed between the columns of the elevated tank.
- 022 – 3 Mar 2026
Yard panels
Concrete was laid in panels across the yard, channel edges were finished by hand and fresh sections were cured with hoses.
- 038 Mar 2026
Night pour
The yard around the aerator and the chambers was concreted at night with the transit mixer under site lights.
- 0414 – 15 Mar 2026
Final pours & curing
Steps and slabs were concreted at night, then the whole yard was kept wet to cure.
- 0523 Mar 2026
Building finishing
Exterior finishing work on the operator building, working from ladders.
- 0625 Jun 2026
Security fencing
Fence posts were welded and concertina wire fixed along the plant boundary.
- 07
Completed
Aerator, filter channels, operator building and elevated tank standing on a finished concrete yard inside the fence.
Before & after
From site work to finished structure.
Gallery
On site.
Start a conversation
Have a construction or infrastructure requirement?
Share your requirement — we’ll get back to you with the next steps.